水泥撒布车使用注意事项!

来源:http://www.tclqgc.com/ 日期:2019-11-20 发布人:
1、由于沥青洒布车在工作过程中各工作装置和管道表面温度很高,请在工作前穿好工作服、带好手套和防护帽,以免烫伤。
  1. Due to the high surface temperature of the working devices and pipes of the asphalt distributor, please wear work clothes, gloves and protective caps before working to avoid scalding.
  2、新车初次使用只允许加入额定容量60%的沥青。
  2. Only 60% of the rated capacity of asphalt is allowed to be added into the new vehicle for the first time.
  3、加入高温热沥青前,必须将罐体内的水清理干净,否则高温热沥青遇冷水会急剧腔胀而喷射出来,将发生危险。
  3. Before adding high-temperature hot asphalt, the water in the tank must be cleaned up, otherwise the high-temperature hot asphalt will expand rapidly in cold water and spray out, which will cause danger.
  4、使用乳化沥青后转换为使用高温热沥青,必须将罐体内的乳化沥青全部清理干净,否则将发生危险。
  4. When the emulsified asphalt is converted to high-temperature hot asphalt, all emulsified asphalt in the tank must be cleaned up, otherwise it will be dangerous.
  5、运输和喷洒过程中,沥青洒布车后工作平台禁止站人。
  5. During transportation and spraying, it is absolutely forbidden to stand on the working platform behind the asphalt distributor.

6、加入高温热沥青后,为起见,非操作人员必须远离沥青洒布车5米以上。
  6. After adding high-temperature hot asphalt, non operators must stay away from asphalt distributor for more than 5 meters for safety.
  7、为了取得比较满意的喷洒质量,加入的沥青必须达到:普通重交道路热沥青在160℃以上;SBS、SBR改性热沥青在185℃以上;SBS、SBR改性乳化沥青在65-85℃之间。
  7. In order to obtain satisfactory spraying quality, the asphalt added must be above 160 ℃ for ordinary heavy traffic road, 185 ℃ for SBS and SBR modified hot asphalt, and 65-85 ℃ for SBS and SBR modified emulsified asphalt.
  8、导热油允许使用温度≤250℃。
  8. The allowable temperature of heat transfer oil is ≤ 250 ℃.
  9、在使用乳化沥青时,大贮存罐底部沉淀物禁止加入沥青洒布车,否则无法使用。
  9. When emulsified asphalt is used, the sediment at the bottom of large storage tank shall not be added to asphalt distributor, otherwise it can not be used.
  10、沥青泵粘住时,不得强行起动,必须加温松动后才可工作。
  10. When the asphalt pump is stuck, it is not allowed to start by force. It can only work after heating and loosening.
  11、准备在使用高温热沥青后转换为使用乳化沥青,必须将沥青泵、管道、罐体内的剩余沥青全部清理干净,否则无法使用。
  11. When preparing to use emulsified asphalt after using high temperature hot asphalt, the remaining asphalt in asphalt pump, pipeline and tank must be cleaned up, otherwise it can not be used.
  12、取力器挂档时,必须分离汽车离合器。否则取力器或汽车变速器将损坏。
  12. When the power take-off is in gear, the car clutch must be disengaged. Otherwise, the power take-off or vehicle transmission will be damaged.
  13、运输时减速器挂高档,喷洒时挂低档。必须在车辆低速或停止时,分离汽车离合器后才能换档。
  13. When transporting, the reducer should be in high gear, while spraying it should be in low gear. When the vehicle is at low speed or stopped, the clutch of the vehicle can be released before shifting.
  14、洒布车在运输过程中,必须脱开取力器,关闭控制器,关闭进出阀门,导热油泵必须停转,禁止在行驶中使用燃烧器。
  14. In the process of transportation, the power take-off must be disconnected, the controller must be closed, the inlet and outlet valves must be closed, and the heat transfer oil pump must be stopped. It is absolutely forbidden to use the burner in the running.
  15、洒布车在运输过程中,必须关闭工作系统气源总开关。
  15. During transportation, the main air source switch of the working system must be turned off.
  16、每车喷洒结束后,一定要清洗沥青泵和管道。
  16. After spraying, the asphalt pump and pipeline must be cleaned.
  17、每天工作结束后,一定要将罐体内剩余沥青放尽。
  17. At the end of every day, the remaining asphalt in the tank must be discharged completely.
  18、新车行驶2500KM以内必须到汽车底盘特约维修站做“走保”,否则汽车底盘生产厂家将不予三包。
  18. If a new car runs within 2500km, it must go to the special maintenance station of automobile chassis for "walking maintenance", otherwise, the manufacturer of automobile chassis will not grant three guarantees.
  19、由于汽车法规不断更新,我公司建议客户在购买新车一个月内申领完机动车牌证。
  19. As the national automobile laws and regulations are constantly updated, our company suggests that customers apply for motor vehicle license within one month after purchasing new cars.

阅读/ Recommended reading

目前国内生产的400马力冷再生机,可以对沥青路面灰土路基进行冷再生作业,还可以当路拌机用。国外主流厂家早已不再生产类似功率的专用路拌机,取而代之的是路面冷再生机,除了路面路基冷再...

沥青路面养护为什么要使用冷再生机? 2024-04-21
你不知道的压路机选型要点 2024-04-11
旧沥青路面冷再生机械如何进行施工? 2024-04-09
湿地推土机的推土技巧? 2024-04-06

产品/ Recommended products