
山东途畅路桥工程有限公司
联系人:石总
电话:18264104888
地址:山东省济南市槐荫区经一路273号群盛华城
冷再生机租赁:旧沥青路面再生技术图文详解
现场冷再生法是用大功率路面铣刨拌合机将路面混合料在原路面上就地铣刨、翻挖、破碎,再加入稳定剂、水泥、水(或加入乳化沥青)和骨料同时就地拌合,用路拌机原地拌合,碾压成型。现场冷再生工艺一般适用于病害严重的一级以下公路沥青路面的翻修、重建,冷再生后的路面一般需要加铺一定厚度的沥青罩面。目前应用类型已从初的单纯水泥冷再生,逐步丰富形成泡沫沥青、乳化沥青冷再生。
On site cold recycling method is to use a high-power road milling and mixing machine to mill, excavate, and crush the road mixture on the original road surface, and then add stabilizers, cement, water (or emulsified asphalt), and aggregates for on-site mixing. The road mixture machine is used for on-site mixing, and finally rolled and formed. The on-site cold recycling process is generally suitable for the renovation and reconstruction of asphalt pavements below the first level with severe diseases. After cold recycling, the pavement generally needs to be covered with a certain thickness of asphalt overlay. At present, the application type has gradually enriched from the original simple cement cold recycling to foam asphalt and emulsified asphalt cold recycling.
现场热再生是一种就地修复破损路面的过程,它通过加热软化路面,铲起路面废料,再和沥青粘合剂混合,有时可能还需要添加一些新的骨料,然后将再生料重新铺在原来的路面上。现场热再生法,可以一次性实现就地旧沥青路面再生,把原材料和需翻修的路面重新结合;或者是通过两阶段完成,即先将再生料重新压实,然后在上面再铺一层磨耗层。
On site hot recycling is a process of repairing damaged road surfaces in situ. It softens the road surface by heating it, scoops up road waste, and mixes it with asphalt binder. Sometimes, new aggregates may need to be added, and then the recycled materials are re laid on the original road surface. On site hot recycling method can achieve on-site regeneration of old asphalt pavement in one go, combining raw materials with the pavement that needs to be renovated; Or it can be completed in two stages, that is, first re compacting the recycled material, and then laying a layer of wear layer on top.
2015年一级市政单选1:将现状沥青耙松,添加再生剂并重新拌合后,直接碾压成型的施工工艺为(A) ?A、现场冷再生 ??B、现场热再生 ???C、厂拌冷再生 ???D、厂拌热再生本题是对冷再生与热再生区别的考查,热再生现场是需要加热软化路面的,冷再生则不需要加热,加入添加剂后直接碾压成型。
What is the construction process for directly rolling and shaping the existing asphalt after raking it loose, adding a rejuvenator, and remixing it? A、 On site cold regeneration?? B、 On site hot regeneration??? C、 Factory mixed cold recycling??? D、 Factory mixed hot recycling is a test of the difference between cold recycling and hot recycling. Hot recycling requires heating to soften the road surface, while cold recycling does not require heating and can be directly rolled into shape after adding additives.
本文由 冷再生机租赁 友情奉献.更多有关的知识请点击 http://www.tclqgc.com/ 真诚的态度.为您提供为的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.
This article is a friendly contribution from Cold Recycling Machine Rental For more related knowledge, please click http://www.tclqgc.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.
阅读/ Recommended reading
- 冷在生机租赁:路面养护措施——冷再生 2025-09-18
- 冷再生机租赁:冷再生技术助推绿色发展 2025-09-17
- 冷再生机租赁:经研究和测试验证的冷再生道路使用寿命超长 2025-09-16
- 冷在生机租赁:就地冷再生摊铺工艺的施工要求 2025-09-08
现场冷再生法是用大功率路面铣刨拌合机将路面混合料在原路面上就地铣刨、翻挖、破碎,再加入稳定剂、水泥、水(或加入乳化沥青)和骨料同时就地拌合,用路拌机原地拌合,碾压成型。现...