冷再生施工和机械租赁业务
筑路架桥,奉献社会;以人为本,不断创新

服务热线

18264104888

新闻中心

首页>>新闻中心冷再生机工程的施工要做好准备工作

冷再生机工程的施工要做好准备工作

来源:http://www.tclqgc.com/ 日期:2022-09-13 发布人:
冷再生机租赁厂家在道路施工前要做好充分的准备工作,才能保障整个施工过程的顺利进行,需要做好哪些准备工作呢?
The leasing manufacturer of cold recycling machine should make full preparations before road construction to ensure the smooth progress of the whole construction process. What preparations should be made?
1、要建立严谨、规范的内部约束、考核、激励机制,用制度管人,用规章管理工程。
1. We should establish strict and standardized internal restraint, assessment and incentive mechanisms, manage people with systems and manage projects with rules.
2、要补充调查工程沿线影响施工的因素,标注出平面位置图,并进行、论证,写出调查报告,作为修订施工方案、编制施工控制预算的依据。
2. The factors affecting the construction along the line of the project shall be supplemented and investigated, the plane location map shall be marked, and the investigation report shall be prepared and demonstrated to serve as the basis for revising the construction scheme and preparing the construction control budget.
3、施工图纸,吃透设计意图,澄清图纸中的问题,恢复定线和施工放样。对所有控制点进行加密、保护、记录。
3. Construction drawings, thoroughly understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4、根据施工合同协议和现场调研认真编制施工控制预算,作为控制支出、进行成本预测分析、经济核算以及统计工程进度的依据。
4. The construction control budget shall be carefully prepared according to the construction contract agreement and on-site investigation as the basis for expenditure control, cost prediction and analysis, economic accounting and project progress statistics.
5、进行业务、技术培训和技术交底,使相关人员对工程的技术标准、操作规程、质量控制、资料整理有多方面的了解。
5. Conduct business, technical training and technical disclosure to enable relevant personnel to understand the technical standards, operating procedures, quality control and data collation of the project in many aspects.
冷再生机租赁
6、建立工地试验室,并申请临时资质。对施工中拟使用的各种原材料取样试验,建立相关技术参数的数据库。
6. Establish site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in the construction, and establish a database of relevant technical parameters.
7、绘制关键工序施工工艺流程图和试验操作规程、质量检查评定、计量支付、设计变更、事故处理等操作管理框图,并使图表上墙。
7. Draw the construction process flow chart of key processes, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident handling and other operation management block diagrams, and put the charts on the wall.
8、根据工期要求、技术标准、机械设备能力、材料供应、自然条件等进行综合分析,选择佳施工方案,完善施工组织设计。
8. According to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., comprehensive analysis shall be conducted to select the best construction scheme and improve the construction organization design.
冷再生机工程的施工要做好准备工作才行,这样才能更好的让工程项目的率的完成,更多相关内容就来我们网站http://www.tclqgc.com咨询吧!
The construction of the cold recycling machine project should be well prepared, so as to better ensure the safe and efficient completion of the project. Please come to our website for more relevant content http://www.tclqgc.com Consult!

阅读/ Recommended reading

目前国内生产的400马力冷再生机,可以对沥青路面灰土路基进行冷再生作业,还可以当路拌机用。国外主流厂家早已不再生产类似功率的专用路拌机,取而代之的是路面冷再生机,除了路面路基冷再...

沥青路面养护为什么要使用冷再生机? 2024-04-21
你不知道的压路机选型要点 2024-04-11
旧沥青路面冷再生机械如何进行施工? 2024-04-09
湿地推土机的推土技巧? 2024-04-06

产品/ Recommended products